Travel Alerts

text size: T T T

Return to Map

HIGHEST IMPACT
I-5 Southbound - Emergency roadwork. Right lane closed southbound I-5, from milepost 96 to milepost 95, until approximately 9 PM, Monday, November 23rd. Expect traffic back-ups and delays.
From milepost 96 to milepost 95
HIGHEST IMPACT
US 12 Both Directions - WHITE PASS IS AT LEVEL ONE WHICH IS A TRACTION ADVISORY FROM MILEPOST 146.0 TO 156.0 AND NO OVERSIZE LOADS.
From milepost 146 to milepost 156
HIGHEST IMPACT
SR 11 Northbound - Emergency closure on SR 11 from milepost 11.5 to milepost 13.5 due to rock slide beginning at 11/23/2009 11:14 AM for the next 0 minutes.
From milepost 12 to milepost 14
HIGH IMPACT
SR 20 Both Directions - SR20 North Cascade Highway is closed for the season at Milepost 134 at Diablo to milepost 171 at the Silver star gate.
From milepost 134 to milepost 171
HIGH IMPACT
SR 103 Both Directions - Trees and power lines down on SR 103 at milepost 16.20 both directions beginning at 11/23/2009 10:32 AM until 12:10 PM
From milepost 16 to milepost 19
HIGH IMPACT
SR 520 Westbound - Crews will close the ramp from westbound SR 520 to southbound I-405 nightly beginning at 11/22/2009 10:00 PM until 11/25/2009 5:00 AM to drill shafts and place concrete for sign bridge bases.
At milepost 7
MODERATE IMPACT
I-5 Northbound - Construction on I-5 from PORT OF TACOMA ROAD to PIERCE-KING COUNTY LINE northbound nightly from 7 p.m. to 4 a.m. beginning 11/23/2009 until 11/25/2009 - two left lanes closed
From milepost 136 to milepost 139
MODERATE IMPACT
I-5 Both Directions - Construction on I-5 from THURSTON-LEWIS COUNTY LINE to SR 121 both directions daily from 7:30 AM to 7:00 PM beginning 11/16/2009 until 11/20/2009 - expect rolling slowdowns and up to five-minute delays
From milepost 86 to milepost 95
MODERATE IMPACT
I-5 Northbound - Exit ramp closed, entrance ramp closed on I-5 Express lanes at Pine Street until further notice.
At milepost 166
MODERATE IMPACT
I-5 - Major road construction, exit ramp closed on I-5 at Olive Way since 10:39 AM, 05/21/09 until further notice
At milepost 166
MODERATE IMPACT
I-90 Both Directions - ROAD CONDITIONS,On I-90 East, From the Argonne On Ramp, to Idaho State Line,Exit 287 to Mile Post 299. The Current Road Conditions are, Bare and Wet.
From milepost 287 to milepost 299
MODERATE IMPACT
I-90 Both Directions - ROAD CONDITIONS,On I-90 West, From Fishtrap Road, to the US-2 Spokane Airport Off Ramp, Mile Post 254 to, Mile Post 276. The Current Road Conditions are, Bare and Dry to Bare and Wet.
From milepost 254 to milepost 276
MODERATE IMPACT
I-90 Both Directions - ROAD CONDITIONS,On I-90 Spokane Viaduct, From the US-2 Spokane Airport On Ramp, to the Argonne Off Ramp, Exit 276 to Exit 287. The Current Road Conditions are, Bare and Dry to Bare and Wet.
From milepost 276 to milepost 287
MODERATE IMPACT
I-90 Westbound - Crews will close the Bellevue Way SE carpool on ramp to westbound I-90 nightly for construction work beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM
At milepost 9
MODERATE IMPACT
I-90 Both Directions - Intermittent single lane closures due to construction work on I-90 from Floating Bridge to Bellevue Way SE in both directions nightly beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM
From milepost 4 to milepost 9
MODERATE IMPACT
I-205 Northbound - Construction on I-205 at milepost 28.00 northbound I-205, Mill Plain Exit – NE 112th Connector (milepost 28) Nov. 23-25, 6 a.m.-5 p.m.: Daytime lane and shoulder closures on I-205, ramps, and adjacent roads for construction work. Nov. 23-25, 7 a.m.-5 p.m.: Daytime flagging on northbound I-205 ramps for construction work. Nov. 23-24: The new 112th connector ramp will be open to traffic from 3:30 p.m. to 7 p.m., Monday and Tuesday, and fully open from 12 p.m. Wednesday through the weekend.
At milepost 28
MODERATE IMPACT
US 2 Northbound - Long term road construction, A current speed restriction, and, width, limit,are in effect,on US-2, from FARWELL RD to State Route 206 East, since 2:31 PM, 05/18/09, until further notice.
From milepost 287 to milepost 289
MODERATE IMPACT
US 2 Both Directions - ROAD CONDITIONS,On US-2 West, From the Rearden, City Limit, to the I-90-Interchange, Mile Post 255 to, Mile Post 283. The Current Road Conditions are, Bare and Dry to Bare and Wet
From milepost 283 to milepost 255
MODERATE IMPACT
US 2 Both Directions - ROAD CONDITIONS,On US-2 North,from Farwell Road, to the Spokane County Line, Mile Post 287 to, Mile Post 315. The Current Road Conditions are, No Report at this Time.
From milepost 287 to milepost 315
MODERATE IMPACT
US 12 Both Directions - 12 milepost 177 near Windy Point: Monday, Nov 23 through Wednesday, Nov 25, during daylight hours, drivers will experience minor delays of up to 30 minutes. Flaggers will direct traffic through a single lane in the work zone.
At milepost 177
MODERATE IMPACT
US 101 Northbound - Landscaping at the US 101 Purdy Creek Bridge requires possible flagger-controlled one-way, alternating traffic. Work hours are 7 a.m. to 4:30 p.m. daily 11/23/2009 through 11/25/2009.
At milepost 339
MODERATE IMPACT
US 101 Both Directions - Construction on US 101 from 6TH STREET to 9TH STREET both directions daily from 7:00 AM to 5:30 PM beginning 11/16/2009 until 11/20/2009 - expect single-lane closures on Simpson Avenue and full cross-street closures between Simpson Avenue and Leeve Street
From milepost 88 to milepost 88
MODERATE IMPACT
US 195 Both Directions - ROAD CONDITIONS,On US 195 ,from Spangle, to the I-90, US 195 Interchange, Mile Post 80 to, Mile Post 96. The Current Road Conditions are, Bare and Dry to Bare and Wet.
From milepost 80 to milepost 96
MODERATE IMPACT
US 395 Both Directions - ROAD CONDITIONS,On US-395 ,from Hastings Road, to the Spokane County Line, Mile Post 170 to, Mile Post 184. The Current Road Conditions are, bare and dry to bare and wet, with ice in places.
From milepost 170 to milepost 184
MODERATE IMPACT
SR 16 Eastbound - Construction on SR 16 at the I-5 interchange in both directions from 11:00 PM to 4:00 AM overnight 11/23/2009 - the northbound I-5 on-ramp to westbound SR 16 closed
At milepost 1
MODERATE IMPACT
SR 20 Both Directions - SHERMAN PASS ROAD CONDITIONS, on SR 20, milepost 319. 28 DEGREES, heavy fog, bare and wet and COMPACT SNOW AND ICE in places. TRACTION TIRES ARE ADVISED AND OVER SIZE LOADS ARE PROHIBITED.
At milepost 319
MODERATE IMPACT
SR 20 Northbound - Long term road construction on SR 20 from S BURLINGTON BLVD to MP 56.85 before Bridge - HIGGENS SLOUGH since 9:57 AM, 07/10/07 until further notice on Weekdays.
From milepost 60 to milepost 57
MODERATE IMPACT
SR 20 Northbound - Long term road construction on SR 20 near Deception Pass from LUNZ RD to FRONTAGE RD since 2:19 PM, 07/23/07 until further notice. Project near completion. No lane closures anticipated at this time.
From milepost 45 to milepost 48
MODERATE IMPACT
SR 27 Both Directions - ROAD CONDITIONS,On SR 27, From the Spokane Valley City Limits, to the Fairfield City Limits, Mile Post 83 to, Mile Post 64. The Current Road Conditions are, Bare and Wet with Ice in Places.
From milepost 83 to milepost 64
MODERATE IMPACT
SR 103 Both Directions - Trees and Debris in the road with a detour in place. Use caution.
At milepost 11
MODERATE IMPACT
SR 103 - SR 103, Both directions at Bolstad Road (milepost 1.39) Flashing signal in progress while City of Long Beach completes construction in this area. The signal will return to normal working operation once construction is complete by the City of Long Beach.
At milepost 1
MODERATE IMPACT
SR 123 Both Directions - SR 123, Cayuse Pass,is closed for the season at the junction of SR 410 and SR 123 to Steven Canyon Road.
From milepost 7 to milepost 16
MODERATE IMPACT
SR 164 Both Directions - Crews will alternate traffic using pilot cars on SR 164 between Enumclaw and Kersey Way daily for striping work beginning at 11/23/2009 9:00 AM until 11/24/2009 3:00 PM. This work is weather dependent.

MODERATE IMPACT
SR 202 Both Directions - Crews will alternate one-way traffic using a pilot car on SR 202 from 208th Ave NE/Sahalee Way NE to W North Bend Way/E North Bend Way/Old SR 90 in both directions daily beginning at 11/23/2009 9:00 AM until 11/24/2009 3:00 PM. This work is weather dependent.
From milepost 10 to milepost 30
MODERATE IMPACT
SR 202 Both Directions - Intermittent lane closures due to construction on SR 202 from NE 145th St/137th Place NE to 148th Ave NE/146th Place NE daily in both directions beginning at 11/23/2009 8:00 AM until 11/24/2009 3:00 PM
From milepost 2 to milepost 3
MODERATE IMPACT
SR 285 Westbound - Expect one of the two lanes westbound to Wenatchee to be closed on weeknights. The speed limit has been reduced to 35 mph and the lanes are narrowed. Crews are adding another eastbound lane to the Senator George Sellar Bridge.

MODERATE IMPACT
SR 303 Both Directions - Maintenance on SR 303 at MANETTE BRIDGE in both directions beginning at 11/23/2009 9:00 AM until 3:00 PM - SR 303 Manette Bridge will be closed. Detour route is the Warren Avenue Bridge
At milepost 1
MODERATE IMPACT
SR 410 Both Directions - State Route 410 is closed for the season from milepost 74.5 near the Morse Creek gate to milepost 57 near Crystal Mountain Boulevard.
At milepost 69
MODERATE IMPACT
SR 410 Both Directions - SR 410 emergency access route on Nile Loop Road is open to all drivers. The route detours around the four-mile closed section of SR 410 between mileposts 104 and 108. Drivers will encounter delays associated with construction activites. Department of Transportation could close the roadway for the safety of drivers at anytime. Information updates are available at 509-577-1635 or 5-1-1.
From milepost 104 to milepost 108
MODERATE IMPACT
SR 410 Both Directions - State Route 410, 13 miles east of Enumclaw - We do not expect construction to affect traffic this week.
At milepost 35
MODERATE IMPACT
SR 508 - SR 508, Both directions in the Bear Canyon area (mileposts 20-22) Motorists are asked to use caution when traveling through the Bear Canyon area, as geotechnical experts are continuing to monitor the slope where a recent slide occurred.
From milepost 20 to milepost 22
MODERATE IMPACT
SR 509 Northbound - SR 509 is reduced to a single lane in each direction, between I-705 and Port of Tacoma Road, since 4:30 p.m. 11/01/09 until further notice for a bridge repair project. The speed limit is reduced to 35 miles per hour through the project work zone.
From milepost 1 to milepost 3
MODERATE IMPACT
SR 520 Westbound - Crews wil close the 108th Avenue NE on ramp to westbound SR 520 nightly beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM to place concrete for sign bridge bases.
At milepost 6
MODERATE IMPACT
SR 520 Eastbound - Crews will close the 92nd Avenue NE on ramp to eastbound SR 520 nightly beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM to place concrete for sign bridge bases.
At milepost 5
MODERATE IMPACT
SR 520 Eastbound - Crews will close the eastbound SR 520 off ramp to 84th Ave NE nightly beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM to drill shafts adn place concrete for sign bridge foundations.
At milepost 5
MODERATE IMPACT
SR 520 Both Directions - Crews will intermittently close up to two lanes in both directions of SR 520 from 76th Ave NE to 116th Ave NE nightly beginning at 11/22/2009 9:00 PM until 11/25/2009 5:00 AM to drill shafts for sign bridge bases.
From milepost 4 to milepost 7
MODERATE IMPACT
SR 522 Both Directions - The business access and transit lanes on SR 522 from 65th Avenue NE to 73rd Avenue NE will have intermittent closures in both directions daily beginning at 11/23/2009 7:00 AM until 11/24/2009 3:30 PM
At milepost 7
MODERATE IMPACT
SR 524 Eastbound - Construction in the right lane on eastbound SR 524 at I-5 beginning at 11/23/2009 9:00 AM until 3:00 PM
At milepost 5
MODERATE IMPACT
SR 539 - Major road construction on SR 539 in both directions from MP 5.50 after E LAUREL RD to BAY-LYN DR since 1:38 PM, 04/25/08 until further notice
From milepost 6 to milepost 10
MODERATE IMPACT
SR 900 Both Directions - Crews will alternate one way traffic on SR 900 from SE 83rd Street to Newport Way daily beginning at 11/23/2009 9:00 AM until 11/24/2009 2:00 PM for wall construction, electrical work and paving. This work is weather dependent.
At milepost 21
MODERATE IMPACT
Fruit Valley Rd Both Directions - Construction on Fruit Valley Rd from 39th St to 39th St both directions until further notice. Vancouver Rail – Rail Bypass and W. 39th Street Bridge Traffic Impacts: Nov. 23-25, 7 a.m.-3:30 p.m.: Daytime flagging at the intersection of W. 39th Street and Fruit Valley Road for utility installation and embankment work. Note: The rail crossing at W. 39th Street is closed to all traffic for rail bypass construction.

LOW IMPACT
I-5 Both Directions - I-5, Both directions at the SR 500 Interchange (milepost 1.9) Nov. 23-25: Daytime intermittent shoulder closures for geotechnical work.
At milepost 2
LOW IMPACT
I-5 Northbound - Construction on I-5 from milepost 69.44 to milepost 82.73 northbound beginning at 06/05/2009 10:16 AM until further notice. I-5, Koontz Road to Harrison Avenue - Paving Nov. 23-27: No traffic impacts scheduled. Remaining work on this project is highly weather dependent and will be suspended through the winter season. Work will resume in spring 2010.
From milepost 69 to milepost 83
LOW IMPACT
I-5 Both Directions - Construction on I-5 from milepost 13.39 to milepost 14.60 both directions I-5 SR 501 Ridgefield Interchange Nov. 23-25, 7 a.m.-5:30 p.m.: Daytime intermittent flagging on SR 501 at the I-5 on-and off-ramps for trucks to entering and exiting the work zone. Work will conclude by 12 p.m. on Wednesday, Nov. 25. Nov. 23-24, 6 p.m.-5 a.m.: Nighttime left lane closures both directions on I-5 for pre-construction activities.
From milepost 13 to milepost 15
LOW IMPACT
US 12 Both Directions - US 12, Both directions between Cedar Line Road and Stiltner Creek (mileposts 106.98-109) Nov. 23-25: Daytime shoulder closures for installation of buried power lines.
From milepost 107 to milepost 109
LOW IMPACT
US 12 Northbound - Construction on US 12 at milepost 149.70 northbound beginning 08/28/2009 1:45 PM until further notice. US 12, West of White Pass Slope Repair Nov. 23-25: Daytime shoulder closures on US 12 for final construction activities
At milepost 150
LOW IMPACT
US 12 Both Directions - US 12, Both directions six miles West of White Pass Summit (mileposts 143.61-144.91) Nov. 9-13: Daytime traffic reduced to a single lane, alternating directions with flaggers for bridge maintenance operations.
From milepost 144 to milepost 145
LOW IMPACT
SR 4 Both Directions - Construction on SR 4 at milepost 59.70 SR 4, Ocean Beach Highway Signal Upgrade - Olympia Way Right Turn Lane (milepost 59.7) – City of Longview Nov. 23-27: No traffic impacts scheduled.
At milepost 60
LOW IMPACT
SR 4 Both Directions - Construction on SR 4 from milepost 27.47 to milepost 55.01 SR 4, Skamokawa to Coal Creek Road - Paving and Guardrail Upgrade Nov. 23-24, 7:30 a.m.-4:30 p.m.: Daytime traffic reduced to a single lane, alternating directions with flaggers and pilot cars between County Line Park and the Coal Creek Slough Bridge vicinity (mileposts 44-52) for guardrail installation work.
From milepost 27 to milepost 55
LOW IMPACT
SR 6 Northbound - Construction on SR 6 at milepost 42.62 northbound beginning at 08/22/2008 12:33 PM until further notice. SR 6, South Fork Chehalis River Bridge Replacement (milepost 42.62) - Open to traffic. Nov. 23-27: No traffic impacts scheduled.
At milepost 43
LOW IMPACT
SR 14 Northbound - SR 14, Both directions between Prindle Road and Smith-Cripe Road (mileposts 27.8-29.3) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for overhead power installation.
From milepost 28 to milepost 29
LOW IMPACT
SR 14 Northbound - Construction on SR 14 at milepost 16.11 SR 14, Pedestrian Tunnel City of Washougal A temporary speed reduction is in place on SR 14 from 55 mph to 25 mph to allow the City's contractor to construct a pedestrian tunnel underneath the highway. This speed reduction will remain in effect throughout the duration of the project. Drivers are urged to use caution when traveling this stretch of roadway.
At milepost 16
LOW IMPACT
SR 105 Both Directions - Maintenance on SR 105 from OYSTER PLACE to JOHN RIVER RD in both directions daily from 8:00 AM to 4:30 PM beginning at 11/23/2009 until 11/25/2009 - expect flagger-controlled, one-way alternating traffic
From milepost 32 to milepost 37
LOW IMPACT
SR 109 Both Directions - Maintenance on SR 109 from COPALIS BEACH to MOCLIPS in both directions beginning at 11/23/2009 8:00 AM until 4:30 PM - expect flagger-controlled, one-way alternating traffic
From milepost 22 to milepost 30
LOW IMPACT
SR 112 Both Directions - Construction on SR 112 from MAKAH RESERVATION to US 101 both directions from 7:00 AM to 5:00 PM beginning 11/16/2009 until 11/20/2009 - expect flagger-controlled, one-way alternating traffic
From milepost 0 to milepost 61
LOW IMPACT
SR 112 Northbound - Slide repair on SR 112, near the West Twin River Bridge, requires flagger-directed one-way, alternating traffic. Work hours are 7 a.m. to 5 p.m. 11/16/09 through 11/20/09.
From milepost 36 to milepost 38
LOW IMPACT
SR 142 Both Directions - SR 142, Both directions between Fisher Hill Road vicinity and Knight Creek vicinity (mileposts 2.01-3.04) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for installation of buried power lines.
From milepost 2 to milepost 3
LOW IMPACT
SR 409 Both Directions - SR 409, Both directions between State Road and Garden Slough Bridge (.54-1.51) Nov. 23-25: Daytime traffic reduced to single lane, alternating directions with flaggers for utility installation.
From milepost 1 to milepost 2
LOW IMPACT
SR 433 Northbound - Construction on SR 433 at milepost 0 SR 433, Lewis and Clark Bridge Painter Nov. 23-27: Crews are working underneath the bridge structure with no anticipated impacts to traffic.

LOW IMPACT
SR 503 Both Directions - SR 503, Both directions between Reese Road and Cougar vicinity (mileposts 33.2-36.07) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for overhead power installation.
From milepost 33 to milepost 36
LOW IMPACT
SR 503 Both Directions - SR 503, Both directions between Frasier Road and Ham Road (mileposts 28.43-29.26) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for installation of buried power lines.
From milepost 28 to milepost 29
LOW IMPACT
SR 503 Both Directions - Construction on SR 503 from milepost 2.66 to 3.01 SR 503, NE 119th Avenue at the Bowyer Market Place Nov. 23-25, 9 a.m.-2 p.m.: Daytime lane shifts on northbound SR 503 for construction activities. Nov. 23-25, 9 a.m.-3 p.m.: Daytime lane shifts on southbound SR 503 for construction activities. Nov. 23-25, 9 a.m.-3 p.m.: Daytime right lane closure on southbound SR 503 at NE 119th Avenue.
From milepost 3 to milepost 3
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between at Hall Road (mileposts 9-9.17) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for road construction.
From milepost 9 to milepost 9
LOW IMPACT
SR 504 Both Directions - Construction on SR 504 from milepost 9.00 to milepost 9.01 SR 504, Hall Road Intersection Reconstruction - Cowlitz County Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions on SR 504 for paving activities. Work is weather dependent. Nov. 23-25: A temporary speed reduction of 25 mph is in place on both directions of SR 504 for the safety of drivers as they will be traveling on a portion of gravel road while crews grind out and replace pavement.
From milepost 9 to milepost 9
LOW IMPACT
SR 506 Both Directions - SR 506, Both directions in the Lacamas Creek vicinity (mileposts 9.52-10.01) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for overhead cable installation.
From milepost 10 to milepost 10
LOW IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) Weight Restrictions Single vehicles are restricted to 18 tons. Tractor-semi trailers are restricted to 29 tons. Truck-trailers are restricted to 36 tons.
At milepost 14
LOW IMPACT
SR 519 Both Directions - Royal Brougham Way is closed to through traffic from Occidental Avenue South to Fourth Avenue South for bridge construction until June 2010, except during major events at nearby stadiums. Follow the signed detour.

LOW IMPACT
Mill Plain Blvd Northbound - Permitted oversize loads prohibited on Mill Plain Blvd in both directions at I-205 since 2:44 PM, 08/29/08 until further notice

LOWEST IMPACT
I-82 Both Directions - I-82 weather between the Tri Cities & the Oregon State Line: Upper 40's, Partly Cloudy, & the roadway is bare & dry.
At milepost 122
LOWEST IMPACT
I-82 Both Directions - I-82 weather between Sunnyside & the Tri Cities: Mid 40's, overcast, & the roadway is bare & dry.
At milepost 85
LOWEST IMPACT
I-82 Both Directions - I-82 weather between Union Gap and Sunnyside: upper 40's, partly cloudy, the roadway is bare & dry.
At milepost 50
LOWEST IMPACT
SR 6 Both Directions - SR 6, Both directions between Chilvers Road and NW Louisiana Avenue (mileposts 49.21-51.22) Nov. 23-25: Daytime traffic reduced to a single lane, alternating directions with flaggers for overhead power installation.
From milepost 49 to milepost 51
LOWEST IMPACT
SR 7 Northbound - A project to connect SR 704 Spanaway Loop Road to SR 7 requires requires no impacts to traffic the week of 11/16/09 through 11/20/09.
At milepost 54
LOWEST IMPACT
SR 7 Northbound - Traffic signal installation on SR 7 at the 304th Street East (or Kapowsin Highway) requires possible right lane and shoulder closures. Work hours are 7 a.m. to 3:30 p.m., 11/16/09 through 11/20/09.
From milepost 34 to milepost 39
LOWEST IMPACT
SR 160 Northbound - Road widening on SR 160, between SR 16 and Long Lake Road, requires no impacts to traffic the week of 11/16/09 through 11/20/09.
From milepost 0 to milepost 3
LOWEST IMPACT
SR 162 Northbound - Construction on SR 162 at CALISTOGA STREET in both directions beginning at 11/23/2009 7:00 AM until further notice - expect no impacts to traffic
At milepost 10