LOW IMPACT
SR 14 Northbound - Construction on SR 14 at milepost 16.11
SR 14, Pedestrian Tunnel City of Washougal
A temporary speed reduction is in place on SR 14 from 55 mph to 25 mph to allow the City's contractor to construct a pedestrian tunnel underneath the highway. This speed reduction will remain in effect throughout the duration of the project. Drivers are urged to use caution when traveling this stretch of roadway.
At milepost 16
The project will construct a pedestrian tunnel underneath SR 14 to create a pedestrian/bicycle connection between the newly reconstructed downtown Washougal city core and the Columbia River waterfront. This project began construction on July 6 and is expected to be complete by the end of this year. For more information, please contact Trevor Evers at (360) 835-8501 or e-mail tevers@ci.washougal.wa.us or visit the project Web page at: www.wsdot.wa.gov/Projects/Local/sr-14-pedestrian-tunnel-285276-te.htm
There are no traffic cameras in this vicinity.